Incinerator Spare part list


Incinerator Rated Capacity: 100/KG/Hr Type of Design: Double Chambered Mode of Heating: Heating Elements Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: Provided with refractory lining with sealing gaskets Outer Body MOC: Mild Steel, 5mm Primary Chamber: Stainless Steel Operating Temperature :800. ± 50◦C Insulation: Insulation Brick Heating Elements Type: Kanthal Al Grade Power Consumption: 75 KW ( Initial Load ) Electrical Supply :3 Phase 440 Volt Control Panel MOC: Mild Steel Power Coated No. of Temp: Controllers : 2 Nos Details: The Control Panel will be provided with contract as relays , switches , indicators etc . Operative on 3 phase. I.D.Fan Type: Centrifugal Type MOC: Mild Steel Capacity:2 HP/3Phase Make of Motor: Kirloskar /Havells/Crompton Combustion Air Fan Type: Centrifugal Type Capacity: 1HP/3Phase Make of Motor: Kirloskar /Havells/Crompton Stack: Type: Wire Supported MOC: Mild Steel of ISstd Height :3 Meters or more
a. be based on common, well-proven and clean technology – both as a complete unit and in terms of its individual components. b. be very robust, sturdy and capable of installation in remote locations subject to severe conditions. d. generate residual incinerator ash conforming to <10% by volume and <25% by weight of the waste…
It will always be our preference that the client pre-incinerates / use of pyrolysis (conditions) the raw e-Waste (printed circuit boards, computer memory etc.) which will allow our plasma smelting furnace to treat a concentrated waste, but increasingly, we are being asked to provide a complete turnkey plant including pre-incineration / pyrolysis of the e-waste. We require indicative information and a budgetary cost please for an incineration / pyrolysis plant that will handle about 3000 tonnes per year of raw E-waste producing about 2000 tonnes per year of Integrated Circuit (IC) Sweeps. Here we assume about a 30 – 35% weight loss due to the removal of volatiles. Charging waste. Close the door. Obtaining the combustion cycle during which no monitoring service ( duration 2 hours ) is required. The combustion cycle automatically ensures : Starting the secondary air fan. After 10 minutes, the afterburner is temperature: ?Turning on the automatic burner combustion chamber , which guarantees the output of the gasification of waste. The operating time of the burner is programmable according to the type of waste, using an adjustable mechanical timer from 1-60 minutes. Automatic start of combustion air fan. After 2 hours , the end of ” combustion cycle ” automatically guarantee : The closure of primary air servomotor . The post-combustion burner off. During charging , opening the door automatically ensures immediate shutdown fan primary and secondary air . At the end of the combustion cycle the fan primary / secondary air and burner continues to run for 2 hours to protect the burners and to cool the oven . After this time the program automatically turns off the installation completely . FUEL USE Ideally, we would like the supplied information to cover material loading/unloading, the incineration / pyrolysis process and the off-gas system (scrubbers etc.). Our understanding is that pre-incineration is conducted to homogenise the waste and to minimise the subsequent losses of species at the smelting stage through the formation of chloride/bromide salts and through oxidation losses, i.e. the halogens being driven off at a lower temperature to that at which the salts/oxides could boil in the smelting stage.
Baltur Burner BT14GW for waste incinerator spare parts oil burner, almost for incinerator capacity 50/100/150kgs per hour. 7.5-14.5kgs per hour diesel oil fuel 0.13Kw 16kgs per set Tel: +86-25-8461 0201 Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com Email: [email protected]: [email protected] Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour Control Mode PLC Auto. PLC Auto. PLC Auto….
1. N95 and Disposable Mask Machine 2. 400mm and 1600mm Melt blown Production Line 3. ES Fiber Production Line N95 Face Mask Machine Production Line Melt blown Production Line A.)Optional Capacity: 1600mm Efficiency: 95-97% FOB Term Price: USD per set Price Valid: 5days. Ave.60 Days ready for shipping. In stock…
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication For incineration, general and pathologicalCapacity 100 C 120 kg/h burn rateType Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time Minimum 8 hours dailyOperating temperature From 850 0C to 1200 0C, Automatic controlledResidual Ash 5 to 10%Construction Constructed from heavy duty mild or aluminized steelOr equal and approved equivalent Insulation material Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock Automatic, Electric typeAsh removal door Provided, for removing resultant bottom ash leftovers from the Primary chamberGratings ProvidedLoading Manual loading of wastePrimary Burner Fully automatic, with fuel, temperature and speed controls with ignition system flame detector Air fan Complete with safety features, flame failure Diesel fired fuel injector type Flange mountedBlower Provided. 3 phase for supplying excess combustion air through the distribution system with speed control systemTemperature Minimum exit 850 0CObservation port To be provided with protective glass type 3.3 Secondary chamber